Wednesday, July 6, 2011

My Second International Paper


Design and development of a 6 MW peak, 24 kW average power S-band Klystron

  • Download Citations
  • Email
  • Print
  • Rights And Permissions

Joshi, L.M.;   Meena, R.;   Nangru, S.;   Kant, D.;   Pal, D.;   Lamba, O.S.;   Jindal, V.;  Jangid, S.K.;   Chakravarthy, D.P.;   Dixit, K.;  
Council of Sci. & Ind. Res., Central Electron. Eng. Res. Inst., Pilani, India 
This paper appears in: Vacuum Electronics Conference (IVEC), 2011 IEEE International
Issue Date: 21-24 Feb. 2011
On page(s): 25 - 26
Location: Bangalore
Print ISBN: 978-1-4244-8662-5
INSPEC Accession Number: 11931694
Digital Object Identifier: 10.1109/IVEC.2011.5746857 
Date of Current Version: 11 April 2011 

ABSTRACT

A 6 MW peak, 24 kW average power S-band Klystron is under development at CEERI, Pilani under an MoU between BARC and CEERI. The design of the klystron has been completed. The electron gun has been designed using TRAK and MAGIC codes. RF cavities have been designed using HFSS and CST Microwave Studio while the complete beam wave interaction simulation has been done using MAGIC code. The thermal design of collector and RF window has been done using ANSYS code. A Gun Collector Test Module (GCTM) was developed before making actual klystron to validate gun perveance and thermal design of collector. A high voltage solid state pulsed modulator has been installed for performance evaluation of the tube. The paper will cover the design aspects of the tube and experimental test results of GCTM and klystron.

No comments:

Post a Comment

Subscribe Now: Google

Followers

Total Pageviews

CO.CC:Free Domain